SAPURA 3500 Posted: Nov 27, 2017 Heavy-Lift Pipelayer On most offshore projects, the work that goes into laying a natural gas pipeline, installing a platform foundation and landing the platform that will draw the gas up to the surface on top would be three separate jobs, completed by three different ships.